Installation

Window Installation in 8 Steps: What to Ask Your Installer

Panoramic aluminium doors and windows with glass (visualisation)
Illustrative image

The 8-step procedure

  1. Preliminary inspection: dimensions, plans and the condition of the supporting structure are verified.
  2. Removal (if applicable): careful removal of the existing product and clean-up of the opening.
  3. Frame fixing per the manufacturer’s specifications and EN 14351-1.
  4. Perimeter insulation with polyurethane (PU) foam, inside and out.
  5. Airtight sealing with quality silicone, neutral or acetic depending on the surface.
  6. Mechanical adjustment: checking and calibrating mechanisms, hinges and tracks.
  7. Final inspection: visual, functional and thermal check of every unit.
  8. Site clean-up: removal of materials and waste from the site.

Client checklist

  • Were measurements taken on site and have you approved the specification sheet?
  • Are removal and clean-up included in the quote?
  • Is perimeter insulation and sealing used on both sides?
  • Are all openings and locks tested before handover?
  • Do you receive a handover protocol and warranty certificate?

Handover and warranty

After the final inspection, both parties sign the handover protocol. The warranty starts from that date: 5 years on the product and 24 months on installation.

What can go wrong

  • Without good perimeter insulation: cold and condensation around the frame.
  • Weak silicone: water and air ingress.
  • Insufficient mechanism adjustment: windows that close badly.
  • Inaccurate measurements: a window that doesn’t fit the opening.

Frequently asked questions

What happens to the existing windows?

They are carefully removed and the opening is cleaned before the new product is installed. You can request removal as part of the quote.

Do you install products bought elsewhere?

Yes. We also offer installation, removal or sealing as a standalone service when the client supplies the product.

What is checked at handover?

A visual, functional and thermal check of every unit; then both parties sign the handover protocol.

When does the installation warranty start?

The installation warranty (24 months) starts from the date of the handover protocol.