Services

The Technical Visit and Measurement: What Happens and How to Prepare

Why there is no quote without measurement

The price of a window depends on dimensions, system, glazing, opening type and hardware. Without on-site measurement, any price is a guess. That is why Apex Frames gives no verbal prices: the price is written only in the detailed quote, after measurement. See what affects the price.

What happens during the visit

  1. Preliminary inspection: dimensions, plans and the condition of the supporting structure are verified.
  2. Measuring every opening: width, height and product type.
  3. Discussing design and performance: material (PVC or aluminium), glass, colour, hardware.
  4. Checking conditions: whether existing windows need removal and what civil work is required.
  5. Measurement form and position specification: every position is documented.

Which documents you receive

  • The position specification sheet, approved by you before production.
  • The quote with a final price, technical specifications, lead time and payment terms; valid for 30 days.
  • The option of alternative quotes for different systems for the same positions.

How to prepare the building

  • Provide access to every opening to be replaced, inside and out.
  • Move furniture or curtains that block measuring.
  • Have the architect’s plan or project ready, if there is one.
  • Mark the windows to be replaced and those that are not.
  • Think ahead about colour, opening type and accessories (shutters, screens).

What comes after measurement

Once you approve the specification and the contract is signed, production starts. Installation follows 8 steps and ends with a handover protocol; see installation in 8 steps and the full process. To book a visit, contact us: we reply within 24 hours.

Frequently asked questions

How long does the technical visit take?

It depends on the number of positions. The appointment is scheduled and confirmed in writing, and you receive the quote within 48 hours of the visit.

Do I pay before signing the contract?

Work does not start without a signed contract and, where applicable, confirmation of the deposit. Payment terms are written in the quote.

Can I get a quote for two systems?

Yes, we offer alternative quotes for different systems for the same positions so you can compare them.

Related

Have a project in mind?

Tell us about your building and we’ll reply within 24 hours.

Request a quote